There is a ditch on the farm that is used to irrigate a wheat field that has not been working well. Joel and our employee Blaine put in a pipe to make it more efficient. Joel's the man for the job because, as he always tells me, "If there's one thing I know how to do, it's lay pipe in the ground."
The master at work.
Joel and Blaine planning their strategy. The ditch is on the right.
Tools needed: a backhoe and someone bossy to run it, pipe, laser leveling device, a shovel and someone to stand in the ditch and take orders.
Making sure the pipe is level with the laser.
Working down the ditch. The pipe will go under the road and fork in a Y shape to run along side the top of the field.
Taking out an old pipe.
Leveling the ground where a new cement box will divert the water at the Y.
Moving the cement box inch by inch.
Perched precariously.
Joel then got the pipes all connected to the cement box. All that's left is pouring concrete to secure everything in place.
And he's done. This will make it easier and less wasteful to water this wheat field.
And what a pretty wheat field it is.
If you've eaten today, thank a farmer.



